Wooden floor laid inside a reception tent

Floor & support

Event flooring & floor hire

Cassette flooring, solid wood floors, finishing carpet, dance floors: we lay the floor that makes your event reliable — slope correction, wet grass, slab or car park — and coordinate it with your tent in a single quote.

Level correction on sloping ground
Laid and removed by our teams
Coordinated with the tent build
One quote, transport included

Our floors

The right floor for your ground.

Modular cassette flooring

Modular cassette flooring

Solid wood floor

Solid wood floor

Carpet & finishings

Carpet & finishings

Dance floor & stage

Dance floor & stage

All in the same quote

A floor designed with your structure, not after it.

The floor is decided at the same time as the tent: it determines anchoring, the build schedule and the final look. Because we operate both, your floor is sized with the structure, laid the day before by the same team, and billed in the same quote — with no coordination surcharge.

  • Technical site survey before sign-off
  • Laying integrated into the tent build schedule
  • Guaranteed structure / floor / furniture compatibility
  • No coordination surcharge between trades

Guide prices

The ranges below exclude transport, which is pooled with your structure's transport in the overall quote.

Modular cassette flooring
€10 – 18 / m²
Solid wood floor
€15 – 25 / m²
Finishing carpet
€6 – 10 / m²
Dance floor (by size)
€350 – 900

Guide ranges observed on our events, adjusted for surface, ground and region. The detailed quote is free and sent within 24 h.

Frequently asked questions about flooring hire

Not always: on flat, dry lawn in summer, carpet can be enough. A floor becomes essential as soon as the ground slopes, is wet or uneven, for a seated dinner, or when the weather is uncertain. During the technical survey we decide with you based on the actual ground.

Yes — that is the main use of cassette flooring: laid on adjustable jacks, it corrects up to around 50 cm of slope and provides a perfectly flat surface, including on grass, gravel or slab.

Yes. Floor and structure share the same schedule: the floor is laid the day before, before or with the tent depending on the configuration, by our teams. You have no trades to synchronise.

Ideally at the same time as the structure, 2 to 6 months before the event for high-season dates (May to September). Outside that, a few weeks are usually enough. The quote is sent within 24 h.

Need a quote straight away?

A reply within 24h with a clear, no-obligation proposal.