Authorisations to set up a marquee: procedures, ERP, safety

From 50 people, a tent or marquee falls under the safety rules for marquees, tents and structures (CTS): the mayor's authorisation is needed before opening to the public.

By the Location Tente de réception France editorial team
Based on 100+ events installed a year and CTS regulatory monitoring

From 50 people, a marquee or reception tent that receives the public falls under the CTS type (marquees, tents and structures) of the safety regulations for places open to the public (ERP). Before opening, the organiser must obtain the mayor's authorisation. From 20 to 49 people, no authorisation request is needed, but basic rules apply.

This article uses guidelines published by public services (an advice note to mayors from a departmental fire and rescue service, and an ERP guide from a city): thresholds, file, deadlines, safety register, safety commission, wind and snow. The guidelines were last checked on 27 October 2026. The texts themselves (orders of 25 June 1980 and 23 January 1985) remain the reference, and the town hall remains the authority that decides.

This is not personalised legal advice: depending on the venue, the duration, the number of people and the nature of the event, the town hall may ask for more. Contact it early.

Summary by number of people

Guidelines for a mobile structure without an upper floor, in place for 6 months at most, based on the public documents consulted.

PeopleTown hallSafety commissionSafety register
Under 20 peopleCheck with the town hallCheck with the town hallNot mentioned
20 to 49 peopleNo authorisation request (CTS 37)Not mentionedNot mentioned
50 people and overMayor's authorisation, file 2 months beforeIf the mayor refers it (one month)Yes, extract 8 days before
Over 6 months or upper floorPrior authorisation (standard ERP procedure)Commission opinionNot mentioned

Sources: advice note to mayors from the Vendée fire and rescue service (SDIS); ERP guide no. 16 from the City of Tours. Simplified summary: the town hall has the final say.

1. When a tent falls under the CTS rules

Marquees, tents and structures are mobile establishments designed to be closed in whole or in part, with a flexible covering, used for shows, meetings, dances, banquets or sports activities. They form the CTS type in the ERP safety regulations.

The sources consulted use three levels, depending on the number of people the structure can hold. From 50 people, the mayor's authorisation is needed before opening to the public. Between 20 and 49 people, no authorisation request is needed, but the operator must comply with article CTS 37: two exits at least 0.80 m wide kept clear, a covering in category M2 material and residual-current protection on any internal electrical installations. For a smaller tent, ask the town hall.

A marquee in place for more than 6 months or with an upper floor follows the standard ERP procedure, with the safety commission's opinion before authorisation. The guidelines below concern mobile structures without an upper floor, in place for 6 months at most, which is the case for an event hire.

2. The procedures and their deadlines

The mayor is responsible for safety in the municipality and authorises the opening. The organiser of the event must obtain this authorisation. It is best to contact the town hall early.

Two deadlines appear in the sources. Article CTS 31 of the safety regulations provides that an extract of the safety register must reach the mayor at least 8 days before opening to the public. The City of Tours guide asks, for its part, for a complete file at least 2 months before the event. Use the longer one as a guide and confirm with your town hall, which may have its own deadlines.

  • Mayor's authorisation: to be obtained before opening to the public, from 50 people.
  • Complete file to the town hall: 2 months before the event (City of Tours guide).
  • Extract of the safety register: at the latest 8 days before opening (CTS 31).
  • Official opinion of the safety commission, if the mayor requests it: one month minimum, except in an emergency.
  • Public roads: authorisation from the road manager (parking permit or road occupation permit), processing of up to 2 months, with no reply meaning refusal (service-public). Ask the town hall about a tent.
  • Bar, music, neighbours: separate procedures, see the related articles.

3. The safety register and the file contents

The safety register is drawn up once, at the first set-up, at the request of the owner or operator, by an approved inspection body. It is issued by the prefect, who assigns the structure an identification number visible on the canvas. The owner or operator keeps an extract of the register available for the police authority at each set-up: this is what the organiser sends to the mayor. Ask the hire company for it when you request the quote.

The extract reflects the structure's administrative situation and its operating limits, notably for the weather. The mayor checks that the number matches the one on the canvas and that the inspection dates have not expired. The assembly and condition of the canvas are inspected every 2 years by an approved inspection body. Other technical installations (heating, lighting, electricity) are inspected every two years.

The City of Tours guide lists the contents of the file: the register extract, a description of the set-up arrangements, the type of activity and the plan of the interior layout showing circulation and exits, and the make-up of the safety team. The certificate of correct assembly and ground anchoring, issued by the installer, must be supplied before opening. The inspection certificates for the technical installations are among the documents to present at any visit. The guide states that any marquee with a floor area over 50 m² must have a register.

4. The safety commission: not automatic

For a mobile structure without an upper floor, in place for 6 months at most, the regulations do not provide for the safety commission to be consulted systematically. If the mayor considers it necessary, they can refer the matter to it for a study or a visit before opening. Only the commission gives an official opinion, and a minimum of one month must be allowed, except in an emergency.

If the commission is consulted, it examines the file and may schedule a visit. Several documents must then be presented on site: the register extract, with an inspection of the covering and structure less than 2 years old, the certificate of correct assembly and the inspection certificates for the technical installations.

5. Wind, snow and storms on the day

Marquees are particularly sensitive to the weather. According to the advice note to mayors, operation must not be authorised, or the establishment must be evacuated, if snowfall exceeds 4 cm without the accumulation on the covering having been avoided, or if the wind speed is likely to reach or exceed 100 km/h (or the value shown on the register extract, if different).

The same note states that in the event of an orange or red alert for violent wind or thunderstorms, this speed may be reached, and that evacuation must begin at the first rumble of thunder at the latest. It is up to the organiser to deny the public access when conditions require it, following the indications in the register. The article on wind and storms on the day itself details what to do.

6. What the town hall looks at in practice

The advice note to mayors groups the points of attention into three families. For evacuating the public: compliance with the number of people, the width of circulation routes, the distance to the outside, emergency lighting, the alarm, dedicated safety staff and written instructions.

To prevent fire: no cooking installations or storage of hazardous materials, electrical and heating installations fitted by qualified people, compliant garlands and decorations, extinguishers in place and trained staff. For emergency services: a telephone link, access routes for emergency vehicles, circulation around the structure and a water point nearby.

7. The organiser's role

The organiser obtains the mayor's authorisation, sends the file within the deadlines and takes the necessary steps to deny the public access when the weather requires it. The register extract is held by the owner or operator of the structure, and the certificate of correct assembly is issued by the installer: ask the hire company for them when you request the quote and keep a copy of the file and the authorisation.

For liability in the event of an accident and insurance for the event, speak to your insurer and the town hall: this article does not put figures on them.

A quote for your event under a marquee

Tell us the venue, the date and the number of people: the request is free and we reply within 24 h.

FAQ

Your questions, our answers

According to the City of Tours guide, for 20 to 49 people no authorisation request is needed, but the operator must comply with article CTS 37: at least two exits of 0.80 m, an M2 material covering and residual-current protection on the electrical installations. For fewer than 20 people or a particular situation, ask the town hall.

The City of Tours guide asks for the complete file at least 2 months before the event, and article CTS 31 requires the safety register extract to reach the mayor at least 8 days before opening. If the mayor refers the matter to the safety commission, allow a further month. Contact the town hall as soon as the date and venue are fixed.

The register is drawn up for the structure by an approved inspection body and issued by the prefect. The owner or operator keeps an extract available for the town hall, and the installer issues the certificate of correct assembly. The organiser sends the extract to the mayor: ask the hire company for these documents when you request the quote.

No. For a mobile structure without an upper floor, in place for 6 months at most, the regulations do not provide for systematic referral. The mayor can refer the matter if they consider it necessary, and only the commission gives an official opinion, with a minimum of one month except in an emergency. Beyond 6 months or with an upper floor, its opinion comes before authorisation.

According to the advice note to mayors, operation must not be authorised, or the structure must be evacuated, if the wind is likely to reach or exceed 100 km/h, or the value on the register extract if it differs. For snow, the threshold is snowfall of more than 4 cm where the covering cannot be cleared.

Occupying public roads requires authorisation from their manager (the town hall in built-up areas, the metropolitan authority, the département or the State depending on the road), according to service-public. Processing takes up to 2 months, no reply means refusal, and a fee may be due. For a tent, ask the town hall.