Choose the site before the structure
The site decides almost everything: the size of the tent, lorry access, electricity, toilets and the plan B. A family garden, a meadow lent by a friend, an estate or a former farm do not impose the same constraints.
Before signing anything, go over the land with a technician's eye. If you are hesitating between sites, compare them on these points rather than on impressions.
- Flat usable area, slope, wet zones or soft ground.
- Lorry access to the spot, width of the gate and tracks.
- Trees, power lines or overhead cables above the planned position.
- Power supply point and its distance from the tent.
- Existing toilets or toilets to add, and their distance from the tent.
- Neighbours: distance to the first homes, habits of the place.